Deck builders · Seattle

Software for Seattle deck builders, permit rules included.

Seattle permits most residential decks without plan review: under 18 inches needs no permit, and up to 14 feet above grade a subject-to-field-inspection permit typically issues within a few working days. The catch is structural: Seattle requires a 60 psf deck live load, half again the model code.

This page carries the sourced permit facts for Seattle and what Evalation does with them: design the deck in live 3D on the first visit, price it from the design, and generate the sheet set the application needs. The playbook for every city is at the permit-ready blueprints guide, and the trade page is at /for/deck-builders.

Seattle by the numbers
18in1
Height above grade at which a Seattle deck needs a permit
14ft2
Maximum deck height for the no-plan-review STFI permit at single-family homes
60psf3
Deck live load Seattle requires, raised from the model code’s 40
12in3
Frost depth for footings in the Seattle Residential Code
  1. Platforms and decks less than 18 inches above grade and not over a basement or other story are exempt from a permit, outside environmentally critical areas. Seattle Department of Construction and Inspections, seattle.gov, accessed November 4, 2026.
  2. SDCI Tip 316, updated October 29, 2026: decks at single-family and duplex homes qualify for a subject-to-field-inspection permit up to 14 feet above grade, not on a roof or over enclosed space. SDCI announced the expansion from the previous 8-foot limit on November 3, 2026; its Decks web page still showed the older threshold at access. seattle.gov, accessed November 4, 2026.
  3. 2021 Seattle Residential Code, Table R301.2 and Table R301.5: ground snow load 20 psf, ultimate design wind speed 98 mph, seismic design category D2, frost line depth 12 inches, and exterior balcony and deck live load amended to 60 psf. seattle.gov, accessed November 4, 2026.
The permit process

How a deck gets permitted in Seattle.

Seattle decks are permitted by the Seattle Department of Construction and Inspections, and the system is friendlier than its reputation. A deck less than 18 inches above grade, not over a basement or another story, and outside an environmentally critical area needs no permit at all. Above that, most residential decks qualify for a subject-to-field-inspection permit, STFI, which means no full plan review: you submit, the permit issues, and the building inspector verifies code compliance in the field as you build.

The STFI window got wider this fall. Tip 316, updated October 29, 2026, allows STFI for single-family and duplex decks up to 14 feet above grade, up from the old 8-foot limit, as long as the deck is not on a roof or over enclosed space like a garage or basement. SDCI says it typically processes STFI permits within a few working days of filing. Decks that fall outside STFI run as a full addition and alteration permit with plan review, where SDCI publishes a 30-day goal for single-family additions and reported 64 calendar days at the 75th percentile as of its current performance page.

The submission itself is lean: a signed STFI checklist, a to-scale site plan showing structures, property lines, and distances, and elevation drawings, filed electronically through the Seattle Services Portal with the fee paid at application. Stamped plans are rarely required. SDCI's own deck page says deck drawings rarely need a stamp from an architect or engineer, with two exceptions that matter: a design outside the Seattle Residential Code's prescriptive criteria, and a ledger connection that does not meet SRC R507.9.1.3. Both put an engineer back in the loop.

What makes Seattle genuinely different is the structure math. The city amended the deck live load from the model code's 40 psf to 60 psf, so spans and posts sized from a generic table can come up short here. Snow load is 20 psf, wind is 98 mph ultimate, seismic category D2, and footings only need to reach 12 inches of frost depth. All of it comes from the 2021 Seattle Residential Code, in force since November 15, 2024, with the next code cycle not expected before mid-2027. Sources: seattle.gov SDCI Decks page, Tip 316, construction permit performance page, and 2021 SRC Chapter 3, all accessed November 4, 2026.

From design to sheet set

Draw it once, in the backyard.

Evalation Lab designs the deck in live 3D with the homeowner watching, on the first visit. The price comes off the design while you are still standing in the yard, and when the design is settled, the Lab generates the standard four-sheet permit set from it: S-1 for the structure, A-1, A-2, and A-3 for the plans, elevations, and details.

For an STFI deck, Seattle asks for a signed checklist, a to-scale site plan, and elevations, categories the Lab’s set covers from the design itself; just mind the 60 psf live load when you frame the structure. Check the generated set against the city's published checklist before you submit, and the first submission goes in clean.

Evalation Lab generates the standard sheet set most jurisdictions require, S-1, A-1, A-2, and A-3, from the finished deck design in under an hour.

Seattle deck questions, answered straight.

Do I need a permit to build a deck in Seattle?

Yes, once the deck is more than 18 inches above grade, over another story, a roof deck, or in an environmentally critical area. Under all of those thresholds, no permit, though the deck still has to meet code. Source: SDCI, seattle.gov, accessed November 4, 2026.

Does a Seattle deck need stamped plans?

Rarely. SDCI states deck drawings seldom need an architect or engineer stamp. The exceptions are decks outside the prescriptive criteria of the Seattle Residential Code and ledger connections that do not meet SRC R507.9.1.3, both of which require engineer-stamped plans.

How long does Seattle deck permit review take?

For STFI-eligible decks, which covers most of them up to 14 feet above grade, SDCI says it typically processes the permit within a few working days. Full plan review for decks outside STFI carries a published 30-day goal and currently runs longer in practice.

What is unusual about building decks in Seattle?

The 60 psf deck live load. Seattle amended the model code’s 40 psf upward, so framing sized from a generic span table may not pass here. The flip side: a mild 12-inch frost depth and a permit path with no plan review for most decks.

Who is Evalation for?

Evalation is built for residential contractors doing $700K to $3.5M a year who have outgrown entry-level tools but refuse enterprise pricing and enterprise implementation.

What does Evalation cost?

Evalation costs $297 per month for the first 50 founding members, locked for life, with no per-user fees. Every membership starts with a free 14-day trial. Full breakdown at /pricing.

Sell the deck in the backyard. File it the same week.

Live 3D design on the first visit, the price from the design, and the sheet set generated for a clean SDCI submission. Compare it against your current tool at /compare/jobtread.

Free 14-day trial, then the Founding Member rate.